Connect-Tek USB-16 Manual de usuario Pagina 34

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 44
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 33
Host High Speed Electrical Test Procedure Revision 1.4
7. Using a DVM measure the DC voltage on the D+ line at J36 with respect to ground. Record in
section EL_8.
8. On the Host Test menu, select TEST_SE0_NAK from the Port Control dropdown menu. Enter
the port number and click Execute once to place the port under test into TEST_SE0_NAK test
mode.
Figure 22: Host Port TEST_SE0_NAK
9. Using a DVM measure the DC voltage on the D+ line at J36 with respect to ground (Outside
pins of J36 are ground pins). Record in section EL_9.
10. Using a DVM measure the DC voltage on the D- line at J36 with respect to ground (Outside
pins of J36 are ground pins). Record in section EL_9.
11. Repeat step 2 through 11 for the remaining ports.
34
Vista de pagina 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 43 44

Comentarios a estos manuales

Sin comentarios